Meeting Time: October 13, 2022 at 5:00pm CDT
The online Comment window has expired

Agenda Item

6.a) Case #221604 – Bailey Station PD, Phase 13 – (The Max Dental Center) – Request approval of a Preliminary Site Plan for a 5,000-square foot proposed building on .91 acres located on the northwest corner of Winchester Boulevard and Peyton Parkway. Applicant /Design Professional: Walkerarch (Michael Walker) Property Owner: Max Breazeal (The Max Dental Center) Project Planner: Josh Hankins

  • Default_avatar
    Adam Boucher about 2 years ago

    Th issue of the sidewalk was discussed in the PC meeting 10/6, and it was determined that it is the duty of the county/state to finish sidewalks along Winchester. At the conclusion of this build, an almost 0.5 mile stretch of road on Winchester will remain without a safe pedestrian right of way. It is noteworthy that the Bailey Station PD is the ONLY PD that has not completed this work along Winchester. The town needs a plan to complete the sidewalk since Bailey Station PD will not.